Skip to content
Lagoons Project — June

Construction

Lagoons Project — June

Scope of work

Construction of engineered lagoons with filtration and water-treatment systems.

The June development assignment covered the construction of engineered man-made lagoons supported by filtration and water-treatment systems. Successful delivery depended on coordinating the lagoon geometry, civil preparation, waterproofing interfaces, circulation requirements and equipment connections as one system. The team planned work so structural and hydraulic elements could be inspected before later layers concealed them. Filtration and treatment components were integrated around the intended operating conditions, with attention to access for testing and maintenance. Commissioning checks helped confirm circulation and water-quality functions before handover. This project shows how El Garhy combines construction, water systems and coordinated site execution to deliver landscape water features that are visually considered, technically controlled and practical to operate over the long term.

Ready to start your project?

Talk to the El Garhy team for a consultation and a tailored quote.

Contact us
Call WhatsApp Contact Us